You send drawings, we quote, you approve, we produce, pack and ship your pergolas, glazing, windows and doors. Pergolas, glazing and other systems take 10–14 days of production, windows and doors 24–28 days, plus about one week of powder coating. Projects of 10 houses or more take about one month longer. Some systems are in stock and ship right away. After that, delivery within Europe takes up to 7 days, and a sea container to the USA or Canada takes 28–32 days.
Want to see what we build first? Browse finished projects with prices.
Every system comes with a 10-year warranty.
From approval to shipping: 10–14 days for pergolas, glazing and other systems or 24–28 days for windows and doors, plus about one week of powder coating. Projects of 10 houses or more take about one month longer. Then transit time to your country.
| Stage | Average time |
|---|---|
| Production: pergolas, glazing, other systems | 10–14 days |
| Production: windows and doors | 24–28 days |
| Powder coating | about 1 week |
| Projects of 10 houses or more | about 1 month longer |
| Systems in stock | ship right away |
| Delivery within Europe | up to 7 days |
| Sea container to the USA and Canada | 28–32 days |
These are average figures. We confirm the exact schedule for your project in the quotation.
On average, from €1 200 within Europe, from $2 200 for a consolidated shipment and about $6 500 for a container to the USA or Canada.
| Route | Average cost |
|---|---|
| Within Europe | from €1 200 |
| Consolidated shipment to the USA or Canada | from $2 200 |
| Container to the USA or Canada | about $6 500 |
$2 200 is the minimum rate carriers charge for a consolidated shipment to North America. Freight is quoted for each project, based on volume, port and delivery address.
We deliver to the port, to your door or straight to the job site, whichever suits your project. Our main option for door and job-site delivery is DAP. Terms follow Incoterms 2020:
| Term | What it means for you |
|---|---|
| EXW Ex Works | You collect the goods at our facility with your own forwarder. We prepare the export documents and supervise loading. |
| FOB Free On Board | We deliver the goods to the port of loading and load them on board. Your forwarder handles the sea freight. |
| CIF Cost, Insurance and Freight | We pay sea freight and insurance to your port of destination. |
| DAP Delivered at Place | Our main option. We deliver to your door or job site. You handle unloading, import customs clearance and duties. |
| DDP Delivered Duty Paid | On request. We deliver to your door or job site with import clearance and duties included. |
Yes. Send us your forwarder's contact, and we provide:
Four types of packaging, chosen for the system and the route.
A sea container takes 28–32 days after loading. Production comes first: 10–14 days for pergolas, glazing and other systems or 24–28 days for windows and doors, plus about one week of powder coating.
Yes. Delivery takes up to 7 days after production, from €1 200 on average.
Yes. Under DAP terms we deliver to your door or job site, and you pay import clearance and duties. DDP, with duties included, is available on request. We can also ship to your port (CIF) or hand the goods to your forwarder (EXW, FOB).
Yes. Our showroom has working mini samples of our pergola, zip screen, guillotine and sliding glass systems.
10 years on all systems.
Email: tr@aluminante.com